SHORING AND STEEL INSTALL

We recently designed and installed a heavy steel structure for our Brooklyn Heights project to create an open floor plan on the garden level. The weight of the top three floors of the building has been successfully transferred to the new steel frame and the former load bearing walls removed. Check out the sequence of events.

84_STEEL_1
84_STEEL_2
84_STEEL_3
84_STEEL_4
84_STEEL_5
84_STEEL_6
84_STEEL_7
84_STEEL_8